
PRESIDENT GEORGE BUSH TURNPIKE - Sunday, Jan. 12, through the morning of Tuesday, Jan. 14 (Nightly) - The following lanes and ramps will be closed nightly from 10 p.m. to 4:30 a.m.:
Two eastbound right lanes at Los Colinas Boulevard
Eastbound entrance ramp from Las Colinas Boulevard
Eastbound PGBT to eastbound I-635 direct-connector ramp
Eastbound I-635 to eastbound PGBT direct-connector ramp
Sunday, Jan. 12 - The following lanes and ramps will be closed in Carrollton from 7 a.m. to 6 p.m.
Two westbound right lanes between the Frankford Road Main Lane Gantry and Trinity Mills Road
Westbound PGBT entrance ramp from Frankford Road
TARRANT COUNTY - Eastbound 820 on-ramp from Mark IV Parkway - The on-ramp to eastbound I-820 from Mark IV Parkway will be closed permanently beginning Jan. 10 until a new ramp is rebuilt in the future as part of the expansion of the North Tarrant Express project. For the duration of the closure, traffic will be redirected to the entrance at FM 156 (Blue Mound Road).
SAM RAYBURN TOLLWAY - Tuesday, Jan. 7, through the morning of Jan. 19 (Nightly)
All lanes of Hillcrest Road/Rasor Boulevard, including the U-turns, between east- and westbound SH 121 (the SRT frontage road) will be closed nightly from 8 p.m. to 5 a.m. Note: This closure will not take place on Fridays or Saturdays.
PRESIDENT GEORGE BUSH TURNPIKE - Wednesday, Jan. 8, through the morning of Friday, Jan. 10 (Nightly)
The westbound I-635 to westbound PGBT direct-connector ramp will be closed nightly from 9 p.m. to 4:30 a.m. Wednesday, Jan. 8, through the morning of Friday, Jan. 10.
Sunday, Jan. 5, through the morning of Tuesday, Jan. 7 (Nightly)
Two westbound right lanes between Valley View Lane and Interstate 635 will be closed nightly from 9 p.m. to 4:30 a.m.
Monday, Jan. 6, through the morning of Thursday, Jan. 9 (Nightly) -Two westbound right lanes between Belt Line Road/Luna Road and Valley View Lane will be closed nightly from 9 p.m. to 4:30 a.m.
Sunday, Jan. 5, through the morning of Tuesday, Jan. 7 (Nightly)
Westbound entrance ramp from Valley View Lane will be closed nightly from 9 p.m. to 4:30 a.m.
The westbound PGBT to westbound I-635 direct-connector ramp will be closed nightly from 9 p.m. to 4:30 a.m.
DALLAS – I-45 @ I-20 RAMP CLOSURES:
Sunday, Jan. 5 at 8 p.m. through Tuesday, Jan. 7 at 5 a.m.
I-20 westbound to I-45 southbound direct connector ramp
Monday, Jan. 6 at 8 p.m. through Wednesday, Jan. 8 at 5 a.m.
I-45 northbound to I-20 westbound direct connector ramp
Tuesday, Jan. 7 at 8 p.m. through Friday, Jan. 10 at 5 a.m.
I-45 southbound to I-20 eastbound direct connector ramp
There will also be alternating lane closures on I-45 northbound and southbound to remove the remaining shielding from Tuesday, Jan. 7 at 8 p.m. to Friday, Jan. 10 at 5 a.m.
DFW CONNECTOR – Northbound SH 121 north of DFW Airport – FULL CLOSURE - 8 PM to 6 AM each night on Tuesday, 1/7- Friday, 1/17 for structures and grading work. Traffic will be detoured to the northbound SH 121 frontage road.
Associated closure: Northbound SH 121 off-ramp to FM 2499, detour to Bass Pro Dr.
Southbound SH 121 at Bass Pro Dr. – FULL CLOSURE - 8 PM to 6 AM each night on Tuesday, 1/7-Wednesday, 1/8 and Friday, 1/10 for structures work. Traffic will be detoured to the southbound SH 121 frontage road.
Associated closure: Southbound FM 2499 off-ramp to southbound SH 121, detour to eastbound I-635 then Royal Ln.
Northbound FM 2499 at I-635/SH 121 – FULL CLOSURE - 8 PM to 6 AM on Thursday, 1/9-Monday, 1/13 for a traffic switch and structures work. Traffic will be detoured to Freeport Pkwy.
SAM RAYBURN TOLLWAY
Monday, Jan. 6, through the morning of Friday, Jan. 10 (Nightly) Two east- and westbound lanes between DNT and US 75 will be closed nightly from 10 p.m. to 5 a.m.
Monday, Jan. 6, through the morning of Jan. 31 (Nightly) – ALL LANES of Josey Lane/Main Street, including the U-turns, between east- and westbound SH 121 (the SRT frontage road) will be closed nightly from 9 p.m. to 5 a.m.
Tuesday, Jan. 7, through the morning of Wednesday, Jan. 8 (Overnight) - The eastbound SRT to the north- and southbound DNT direct-connector ramps will be closed overnight from 10 p.m through 4 a.m.
Tuesday, Jan. 7, through the morning of Wednesday, Jan. 8 - All eastbound lanes of the Sam Rayburn Tollway between the Denton Tap Road Main Lane Gantry and MacArthur Boulevard will be closed from 10 p.m. to 4 a.m.
The eastbound entrance ramp from Denton Tap Road will be closed from 10 p.m. Tuesday, Jan. 7 to 4 a.m. Wednesday, Jan. 8.
DALLAS –TxDOT will close ALL northbound lanes of Interstate 635 (I-635) at the US 175 interchange on Thursday, Jan. 9 from 9 p.m. to 5 a.m. This closure is necessary for the safe removal of a damaged sign bridge.
TxDOT will also close both lanes on the ramp from US 175 to northbound I-635 along with the left lane on southbound I-635.
Traffic will be redirected to take eastbound or westbound US 175. Detours will be marked to assist with traffic control. Backups are expected and motorists are encouraged to seek alternate routes.
PRESIDENT GEORGE BUSH TURNPIKE - Thursday, Jan. 9, through the morning of Friday, Jan. 10 (Nightly)
Two northbound and southbound left lanes at Conflans Road will be closed nightly from 9 p.m. to 5 a.m.
Thursday, Jan. 9, through the morning of Friday, Jan. 10 (Nightly)
Two northbound and southbound right lanes at Lower Tarrant Road will be closed nightly from 8 p.m. to 5 a.m.
DALLAS NORTH TOLLWAY - Sunday, Jan. 12 - The following closures will be needed from 3 a.m. through noon:
• Southbound right lane at Interstate 635
• Southbound Spring Valley Road entrance ramp
• The southbound DNT to east- and westbound I-635 direct-connector ramp
MOUNTAIN CREEK LAKE TOLL BRIDGE - Saturday, Jan. 11 - ALL east- and westbound lanes will be closed from 6 a.m. to noon Saturday, Jan. 11.