
Las Vegas, NV (KXNT) - The Nevada Department of Transportation (NDOT) has released a schedule of restrictions for next week as a viaduct rehab project continues to affect a stretch of U.S. 95 between the Spaghetti Bowl and Eastern.
Sunday Night—Monday Morning (July 18-19)
• The left travel lane along southbound Interstate 515 will be closed between Boulder Highway and Twain Avenue from 9 p.m., July 18, until 5 a.m., July 19, in Las Vegas.
Monday Night—Tuesday Morning (July 19-20)
• The left travel lane along southbound Interstate 515 will be closed between Boulder Highway and Twain Avenue from 9 p.m., July 19, until 5 a.m., July 20, in Las Vegas.
• The left travel lane along northbound Interstate 515 will be closed between Twain Avenue and Boulder Highway from 9 p.m., July 19, until 5 a.m., July 20, in Las Vegas.
Tuesday Night—Wednesday Morning (July 20-21)
• The Casino Center Boulevard onramp to northbound Interstate 515 will be closed from 9 p.m., July 20, until 6 a.m., July 21, in downtown Las Vegas.
• The left travel lane along northbound Interstate 515 will be closed between Twain Avenue and Boulder Highway from 9 p.m., July 20, until 5 a.m., July 21, in Las Vegas.
Wednesday Night—Thursday Morning (July 21-22)
• Northbound Interstate 515 will be closed between Las Vegas and Martin Luther King boulevards from 11 p.m., July 21, until 5 a.m., July 22, in downtown Las Vegas to remove and install overhead freeway signs.
• The onramps from Casino Center and Las Vegas boulevards to northbound Interstate 515 will be closed from 9 p.m., July 21, until 6 a.m., July 22, in downtown Las Vegas.
Friday Morning (July 23)
• The Martin Luther King Boulevard and Interstate 15 onramps to southbound Interstate 515 will be closed from 12:01 a.m. until 5 a.m., July 23, in downtown Las Vegas.
• Southbound Interstate 515 will be closed between Martin Luther King and Las Vegas boulevards from 2 a.m. until 5 a.m., July 23, in downtown Las Vegas to remove and install overhead freeway signs.
The project will extend the near-term service life of the 1.6-mile-long viaduct between Interstate 15 and Eastern Avenue, portions of which were built almost 60 years ago. (A viaduct is a long bridge-like structure carrying an elevated roadway not to be confused with an aqueduct that conveys water).
The project will also repair and overlay the entire 1.2 million square foot viaduct deck surface between the Union Pacific Railroad and 21st Street – the equivalent of 25 football fields – as well as reconstruct the Casino Center Boulevard off-ramp hinge while seismically retrofitting selected viaduct columns. Also, a new southbound auxiliary lane will be added between Interstate 15 and Eastern Avenue by lane restriping, and the Eastern Avenue southbound offramp will be widened to two lanes.
Work is expected to be finished in late 2022.