Skip to content

Condition: Post with Page_List

Listen
Search
Please enter at least 3 characters.

Latest Stories

Panther Hollow Bridge closed out of an abundance of caution

Panther Hollow Bridge detour
Panther Hollow Bridge detour
City of Pittsburgh

The Panther Hollow Bridge in Schenley Park was closed over the weekend based on a recommendation from PennDOT.

It's unclear how long the bridge will be closed.


The city says any needed repairs will be made after further analysis.

Any needed repairs will be completed after a more in-depth inspection.

The detour goes through Schenley Drive, Wightman Street, Beacon Street, and Hobart Street.
(See the photo above).

"Based on the recommendation of PennDOT and the inspection consultant we will be closing the bridge as a public safety measure until further analysis can be completed. DOMI is working to post barricades and bridge closed signs on Saturday. We hope to have detour signage in place within the next several days," said Chief Engineer Eric Setzler P.E.